Installation & services

Efficiency that exceeds expectations

A uPVC window is only as good as its installation. This is the process our team and partner fabricators follow, and the support that continues after handover.

  1. Site survey

    Surveys begin during the plastering stage. Height, width and diagonals of every opening are measured with the site engineers.

  2. Design confirmation

    Window sizes, designs and placements are confirmed with the engineer before fabrication.

  3. Positioning

    Windows are positioned exactly using tube level and plumb level so frames are true and square.

  4. Anchoring

    Frames are screwed with hanger fastener screws using hammering machines so they hold strongly to the walls.

  5. Sealing

    Perimeters are sealed with silicone sealant for tight packing without gaps. Protective tape is removed after installation.

Service & support

Our relationship begins after installation.

We understand the importance of after-sales service and its impact on long-term relationships. Our experienced service team handles post-sales queries promptly — from hardware adjustment and gasket replacement to technical guidance for fabricators.

Raise a service request
Fenplast protective tape — remove immediately after installation
Installer's noteRemove the protective tape immediately after installation
Before installation

Getting the site ready

Most installation problems start before the installers arrive. This is what the opening should look like.

  • Openings plastered, square and to the agreed size, with diagonals checked
  • Sills finished with an outward slope and drip groove
  • Chajjas and sunshades complete so water falls clear of the frame head
  • Finished floor level confirmed for door frames
  • Wet trades complete in the room, or windows protected from slurry
  • Clear access and safe working platforms for upper floors
Installation standards

What good installation looks like

The practices we train fabricators to follow on every site.

StageStandardWhy it matters
PositioningPlumb, level and square, checked with level and diagonalsSashes run smoothly and seal evenly
PackingPackers under fixing points and at cornersFrame doesn’t twist when screws are tightened
AnchoringFrame fasteners into masonry at regular centresResists wind load and daily use
CavityGap between frame and wall fully filledStops air, water and noise paths
SealingContinuous silicone outside and insideThe main defence against leaks
DrainageSlots clear and opening to the outsideWater in the track drains away
AdjustmentHardware set for smooth operation and even gasket pressureEasy use, tight seal
FinishingProtective tape removed, frames and glass cleanedTape bakes on if left in the sun
After handover

Care and service

uPVC windows need very little, but a few minutes of care a few times a year keeps them running like new: clean tracks and drainage, wipe gaskets, lubricate hardware lightly, and do a quick check before the monsoon. Our maintenance guide sets out a simple yearly routine.

If something isn’t right — a sash dropping, a lock not pulling tight, water entering during rain — contact the fabricator who installed the window first. Most issues are quick adjustments. Fabricators using Fenplast profiles can call our technical desk for guidance on profiles, reinforcement and fabrication.

Why uPVC windows leak — and how to fix it

FAQ

Installation questions

When should uPVC windows be installed during construction?

Site surveys start during plastering. Final installation is best done after wet trades and before final painting, with protective tape removed immediately afterwards.

How long does installation take?

A typical apartment can be installed in a day or two once frames are fabricated; larger projects are scheduled floor by floor.

Who seals the gap between the window and the wall?

The installation team fills the cavity and seals the perimeter with silicone inside and out. It’s a critical step for preventing leaks.

What should I check at handover?

Every sash opens, closes and locks smoothly; frames are plumb and square; perimeter silicone is continuous; drainage is clear; protective tape is removed; glass is undamaged.